This is an MCQ-based quiz on the topic of Industrial Engineering.
This includes Plant location and Layout, Operations Research, Inspection and Quality Control, Contemporary Quality Management concepts, Operations Research, and many more.
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.
Critical Path Net Work helps an engineer
Queueing theory is used for
Percent idle time for men or machines is found by
A critical activity has
Break-even analysis shows profit when
PERT analysis is based upon
Pessimistic time is
The appellate authority for an industrial dispute is
Choose the wrong statement. Motion study is used for
What is the CPM?
Who is the father of Industrial Engineering?
What is Basic tool in work study?
Which layout is suited for mass production?
What does PERT stands for?
What is Micromotion study?
Job evaluation is the method of determining the
........... is not an incentive plan.
What is Equipment failure?
What does the symbol imply in work-study?
Transport
Inspection
Delay temporary storage
Permanent storage