This is an MCQ-based quiz on Airport Engineering.
This includes the planning, design, construction, operation, and maintenance of facilities providing for the landing and takeoff, loading and unloading, servicing, maintenance, and storage of aircraft.
An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be
The bearing of the longest line of a wind rose is S 45° E, the bearing of the runway will be numbered
The strength of winds is measured with the help of
The depressions and undulations in the pavement, are caused due to
The centre to centre spacing of heliport lighting along the periphery of landing and takeoff area should be
The runway orientation is made so that landing and takeoff are
Two single runways may be arranged so as to have
The width and interval of transverse centre line bars along the extended centre line of runway, in approach lighting system are
What should be the wind intensity during a quiet period in the runway?
When was the International Civil Aviation Organization established in Montreal (Canada)?
What is the minimum width of clearway?
According to I.C.A.O. all markings on the runways are painted white and on taxiways
The best direction of a runway is along the direction of
An aircraft is flying in an atmosphere of 30°C with a speed of 1260 kmph. Its speed is known as
According to the International Civil Aviation Organisation, the runway lengths of aerodromes, have been coded by .............
Airport elevation is the reduced level above M.S.L. of
What is the size of landing area for multi engine helicopters operating under 1 FR conditions?
................ is used for servicing and repairs of the aircraft?